Flexomic fast

This one-year product builds on tried-and-true methods and is suitable for hedging seasonal price fluctuations as well as for portfolio optimization in the short-term markets. "Flexomic fast" combines a quick turnover period of 53 days with competitive operating fee and additional possible discounts.

  

The storage product Flexomic fast is offered at a fixed price and has a duration of two years. The product includes a total working gas volume of 100 GWh and consists of 4 lots of 25 GWh each.

The bidder submits his offer for the annual storage fee in €/MWh. As part of this auction, you are making a binding offer to close a storage contract for "Flexomic fast" for the desired number of lots with Trianel Gasspeicher Epe GmbH & Co. KG ("TGE"). Bids should be submitted via email to storage-auction@trianel-epe.de. We kindly ask you to scan the completed and signed auctionform and attach it to the email.

For detailed information on the requirements for submitting an offer we refer to the auctionform in the documents section.

If you submit more than one offer, these will be considered as binding offers for the respective specified capacity and can be accepted by TGE independently of each other.

All information regarding this auction must be treated confidentially.

  

Capacities and Offered Lots

Duration 1 year (April 1, 2026, 6:00 a.m. CET to April 1, 2027, 6:00 a.m. CET)
Turnover period 53 days  
Number of Lots 4  
Working Gas Volume 25 GWh per Lot Total 100 GWh
Withdrawal Rate 78 MW per Lot  
Injection Rate 39 MW per Lot  

Prices

Pricing Fixed Price
Annual Storage Fee Your Offer Price in Euros per MWh per storage year
Operating Fee 0,28 €/MWh (during the period from November to April)
0,57 €/MWh (during the period from May to October) 

The operating fee refers to the storage year 2024/2025. It will be adjusted annually at the beginning of each storage year in accordance with § 3, paragraph 2 of the General Terms and Conditions (Fees/Price Adjustments).

Contact Persons

Christoph Butterweck

Christoph Butterweck

Project Manager for Storage Marketing

Frank Metzger – Leiter Kraftwerks- & Speichereinsatz bei TGE

Frank Metzger

Head of Power Plant & Storage Operations